- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Uttar Pradesh Projects Corporation Limited
- >
NTID 43326787
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Morden Worksho in Basti - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Morden Worksho" in Basti, India.
Uttar Pradesh Projects Corporation Limited
Basti, Uttar Pradesh, India
NTID 43326787
- Opening Date : Wed 31st December, 2025
- Closing Date : Wed 31st December, 2025
- ₹ 35178000.00
- NTID 43326787
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
703000.00 -
Document Cost
17700.00 -
Estimated Cost
35178000.00
BOQ Items Total Items : 414 | Total Qty : 139051.2290471
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK | ||
| 2 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenchesor drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C within a lead of 30 m. (All kind of soil) | 187.841295 | Cum. |
| 3 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap): | ||
| 4 | 550 mm dia single reamed pile | 946 | Metre |
| 5 | 300 mm dia single reamed pile | 44 | Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054