Inquiry NowConstruction Of Modular Operat in Koderma - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Modular Operat" in Koderma, India.
- Opening Date : Fri 17th April, 2026
- Closing Date : Thu 16th April, 2026
- ₹ 12735490.00
- NTID 44798740
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
254800.00 -
Document Cost
10000.00 -
Estimated Cost
12735490.00
BOQ Items Total Items : 140 | Total Qty : 8917.235
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. | 193.260 | M2 |
| 2 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 16.450 | Sqm |
| 3 | Providing designation 75 A brick work in C.M. (1: 3) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. | 12.285 | CUM |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1 :3 (1 cement : 1 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 2.160 | Cum |
| 5 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours.The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. sqm 516.60 | 71.560 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.