Inquiry NowConstruction Of Missing Link I in Kendujhar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Missing Link I" in Kendujhar, India.
- Opening Date : Sat 31st October, 2026
- Closing Date : Fri 30th October, 2026
- ₹ 34957410.00
- NTID 47124254
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
350000.00 -
Document Cost
10000.00 -
Estimated Cost
34957410.00
BOQ Items Total Items : 30 | Total Qty : 26194.601
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing shrub jungles, uprooting stumps and small bushes and trees below 1.00M girth on pre-measurement including disposing off the debris clear of the work site with supply of all equipments, tools and plants, labour required for the work including royalties,cess etc. all complete as per the direction of the Engineer-in-charge. | 2520 | 100 Sqm |
| 2 | Triangular or square section trench cutting 0.15m. deep for alignment and demarcation purpose and dug belling 10cm to 15 cm including marking lines with cost of all labour, cess and T&P etc. complete as per the direction of the Engineer-in-charge. | 630 | Rm |
| 3 | Excavation of canal / drain in both wet and dry condition by mechanical means in all kinds of soil (This shall include ordinary soil, sand, silt, slushy soil, hard soil, gravelly soil, stoney earth mixed with gravels, pebbles, stone boulder not exceeding 1/2cum by volume, moorum, etc.) including dewatering, rough dressing and levelling the excavated canal slopes and bed to design section and depositing the useful approved excavated earth in the canal embankments in filling section in layers not exceeding 22.5cm. in depth and breaking clods to maximum 5cm to 7cm size and depositing the un-useful surplus materials in spoil banks or on any other specified space with proper section, as directed, by mechanical means, including cost of all leads, lifts and de-lifts, loading and unloading, handling and re-handling, with all cost for site illumination, mobilisation and demobilisation, diversion road, coffer dam, and royalties,cess, T&P etc. complete, with all cost incidental to the work as per the specification and direction of the Engineer-in-charge.(Measurement will be taken on finished level section.) | 589.323 | Cum |
| 4 | Excavation of canal / drain by mechanical means in DI rock, laterite rock and soft rock not requiring blasting, removable by pick-axe and crow bars, in both wet and dry condition, including cost of all incidental charges etc. and depositing the excavated materials either in spoil bank or in any other specified space, as directed, by mechanical means, including cost of all leads, lifts and de-lifts etc. including dewatering with all cost and running charges of pumps and accessories, cofferdams, dressing and levelling the bed and sides to design section, with all cost for site illumination, mobilisation, demobilisation and royalties,cess, T&P etc. complete as per the specification and direction of the Engineer-in-charge. (Measurement will be taken on finished level section) | 348.162 | Cum |
| 5 | Earthwork in canal embankments including specified proud for all height using approved earth excavated by mechanical means from borrow area (to be arranged by the contractor observing all statutory acts / rules such as PESA/OMMC Rule -2004 etc.) including cost of loading into and transportation by mechanical means, unloading the earth in canal embankments/ canal beds on properly prepared and scientifically approved surface with cost of all leads, lifts, de-lifts, handling and re-handling charges etc., spreading and levelling the earth in layers not exceeding 22.5cm. in depth, removing the undesirable materials, breaking clods to maximum 5cm to 7cm size, and make it ready for watering and compaction with vibratory roller as per the canal section but excluding the cost of spreading , watering and compaction and including the cost of lighting borrow areas, construction of approach roads to borrow areas, diversion roads, site illuminations, mobilisation, demobilisation, royalties, cess, T&P and all other cost incidental to the work etc. complete as per the direction of the Engineer-in-Charge. (Measurement of earthfill to be taken on finished compacted level section under OMC condition) | 920.836 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054