- Home
- >
- Tender
- >
- Tripura Tender
- >
- Department of Tripura Urban Planning and Development Authority
- >
NTID 42771992
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Major Drain Fr in Teliamura - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Major Drain Fr" in Teliamura, India.
- Opening Date : Fri 5th December, 2025
- Closing Date : Fri 5th December, 2025
- ₹ 44247661.00
- NTID 42771992
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
885000.00 -
Document Cost
8000.00 -
Estimated Cost
44247661.00
BOQ Items Total Items : 38 | Total Qty : 27047.92
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201. By Manual Means In area of non-thorny jungle | 0.41 | Hectare |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soils. | 4142.23 | Sqm |
| 3 | Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202. | 50.12 | Cum |
| 4 | Dismantling of flexible pavement and disposal of dismantled material up to a lead of 1000 meters, staking serviceable and unserviceable materials separately and as per leavent clauses of section-200. ( I ) By Manual Means (A)Bituminous Road | 20.02 | Cum |
| 5 | (B)Granular Road | 8.01 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054