- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Minor Irrigation Department
- >
NTID 43233224
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Mahibila Check in phulbani - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Mahibila Check" in phulbani, India.
- Opening Date : Tue 30th December, 2025
- Closing Date : Mon 29th December, 2025
- ₹ 12196000.00
- NTID 43233224
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
122000.00 -
Document Cost
10000.00 -
Estimated Cost
12196000.00
BOQ Items Total Items : 11 | Total Qty : 10143.06
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter-spread with boulders up to cum. Size with all lifts and de-lifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge with all leads from the place of excavation complete in all respect as directed by the Engineer in charge. (measurement should be taken on finished level section) (over burden cutting) | 1878.250 | one cum |
| 2 | Excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and fit for laying concrete and depositing the excavated materials clear of work site as & where directed with all leads & lifts including showing shuttering propping bulla & dewatering from foundation if necessary etc. complete in all respect by the Engineer in charge. | 1896.440 | one cum |
| 3 | Excavation of foundation in D.I. Rock not requiring blasting to be removed by pick axes and crow bars and depositing excavated materials with 50m. initial lead and 1.50m. initial lift including rough dressing as per specification of the department including stacking useful materials separately with all labour charges and T&P charges required for this item as per direction of the Engineer in charge. | 86.980 | one cum |
| 4 | Cement Concrete (M 15) with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item complete as directed by Engineer-in-charge. | 1256.950 | one cum |
| 5 | Rainforced Cement concrete in (M 20) with 20 mm down grade hand broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials labour, T&P materials required for this item complete as directed by Engineer-in-charge. | 359.810 | one cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054