- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Department Of Water Resources
- >
NTID 45607940
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Irrigation Wel in Bicholim - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Irrigation Wel" in Bicholim, India.
- Opening Date : Fri 3rd July, 2026
- Closing Date : Thu 2nd July, 2026
- ₹ 1006922.00
- NTID 45607940
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20138.00 -
Document Cost
3000.00 -
Estimated Cost
1006922.00
BOQ Items Total Items : 30 | Total Qty : 2423.71
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in all types of strata comprising any of the material such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerate, laterite rock, soft rock, disintegrated rock, fissured, shattered/decomposed rock or weathered rock and all such other material as described under appendix to these specification either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry moist, saturated, submerged foul conditions etc including providing barricading danger lighting gaurding as directed by the Engineer in- Charge with 50 mts. lead and all lifts etc as specified and directed etc complete. | 258.74 | Cum |
| 2 | Reinforced cement concrete work in well steining excluding the cost of centering, shuttering, finishing and reinforcement with 1:1 :3 (1 cement: 1 coarse sand: 3 graded granitic or basaltic aggreate 20mm nominal size | 25.00 | Cum |
| 3 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. All kinds of soil | 7.00 | Cum |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 1.70 | Cum |
| 5 | Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All work up to plinth level | 1.60 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054