- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Public Works Department
- >
NTID 44942870
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Health Sub Cen in Nagrota - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Health Sub Cen" in Nagrota, India.
Public Works Department
Nagrota, Himachal Pradesh, India
NTID 44942870
- Opening Date : Mon 27th April, 2026
- Closing Date : Mon 27th April, 2026
- ₹ 3709746.00
- NTID 44942870
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
74200.00 -
Document Cost
2000.00 -
Estimated Cost
3709746.00
BOQ Items Total Items : 124 | Total Qty : 14395.63
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains etc. in all kind of soil (not exceeding 1.5 m (one point five Metre) in width or 10 Per Square Metre (ten square Metre) on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil asdirected, within a lead from the edge of excavation . All kind of soil complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | 143.35 | Per Cubic Metre |
| 2 | Excavation in drains and channels etcetera; in earth work in all kind of classification of soil, such as pick work, jumper work, pick jumper work, blasting work, hard and soft blasting and work doing in saturated soil including chiseling or welding out works where blasting work is prohibited including shoring, strutting and pumping or bailing out water (Surface and sub soil water) upto any depth or any height / quantum of water including slush which may arrise during dewatering removal of slush and any other mixed variety of soil, stacking the excavated soil for all heights clear from the edge of excavation and then returning the stacked soil in 15cm (Fifteen centimeter) layer when required into plinth sides of foundations etcetera. Consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as per approved drawing, design, specification and as per the entire satisfaction of the Engineer-Incharge including carriage of material within all leads, lifts of and other incidentals. The rate is inclusive of octroi, royality, Malkana, Toll tax, sale tax, GST and any other taxes imposed by the Government. | 18.95 | Per Cubic Metre |
| 3 | Supplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | 7.74 | Per cubic metre |
| 4 | Stone Filling in plinth with approved stone under floors including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals as per specifications, approved drawing, design, specifications and as directed by the Engineer-in-charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, sale tax, GST and any other taxes imposed by the Government. | 6.55 | Per cubic metre |
| 5 | Providing and laying cement concrete 1:4: 8 (One cement: four sand: eight graded crushed/broken stone aggregate 40mm nominal size) and curing complete, excluding cost of form work in foundation and plinth including carriage of material in all leads and lifts and other incidentals complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate is inclusive of octroi, royality, malkana, toll tax, GST and all type of other taxes imposed by the Government. | 12.40 | Per Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054