- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Department of Rural Development
- >
NTID 44333966
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of H l Bridge Wit in Nabarangapur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of H l Bridge Wit" in Nabarangapur, India.
Department of Rural Development
Nabarangapur, Odisha, India
NTID 44333966
- Opening Date : Wed 18th March, 2026
- Closing Date : Tue 17th March, 2026
- ₹ 40404000.00
- NTID 44333966
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
405000.00 -
Document Cost
10000.00 -
Estimated Cost
40404000.00
BOQ Items Total Items : 45 | Total Qty : 4823.274
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of in hard soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and direction of Engineer-in-charge. | 1,709.520 | cum |
| 2 | Earth work in excavation of in hard soil in foundation with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and direction of Engineer-in-charge. | 1,508.876 | cum |
| 3 | Cement concrete (1:3:6) in foundation & plinth with 4cm. crusher broken granite metal of approved quality from approved quarry including hoisting lowering & laying in layers not exceeding 150mm. thick with proper packing & ramming each layer of concrete by means of vibrator ,providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per specific ation & direction of the Engineer-in-Charge. | ||
| 4 | In Substructure | 19.592 | cum |
| 5 | In Foundation | 116.130 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054