Inquiry NowConstruction Of Guard Wall Nea in Jalpaiguri - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Guard Wall Nea" in Jalpaiguri, India.
ZILLA PARISHAD
Jalpaiguri, West Bengal, India
NTID 42713897
- Opening Date : Sat 6th December, 2025
- Closing Date : Wed 3rd December, 2025
- ₹ 330040.00
- NTID 42713897
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
6601.00 -
Document Cost
Refer Documents -
Estimated Cost
330040.00
BOQ Items Total Items : 10 | Total Qty : 372.61
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | PWD Building Schedule Page No. - 1, Item No. - 2 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 30.68 | CUM |
| 2 | (Page No. 1,Item No. 3 of PWD Building Schedule (2017) Earth work in filling in foundation trenches or plinth with earth. in layer not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (payment to be on basis of measurement of finished quantity of work.) (a) with earth obtainedfrom excavation of foundation | 6.14 | SQM |
| 3 | PWD Building Schedule (2017) Page No. - 47, Item No. - 3 Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 47.20 | SQM |
| 4 | PWD Building Schedule (2017) Page No. - 24, Item No. - 4 (b) (3rd Corrigendum) Ordinary cement concrete ( mix 1:2:4) with graded stone chips ( 20mm nominal size) excluding shuttering and reinforcement if any , in ground floor as per relevant IS Codes. (b) River bazree | 53.10 | CUM |
| 5 | PWD Building Schedule (2017) Page No. - 43 & 42, Item No. - 36 (3rd Corrigendum) Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation | 73.15 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054