NTID 44431648
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Four Lanning O in Botad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Four Lanning O" in Botad, India.
- Opening Date : Refer Documents
- Closing Date : Thu 9th April, 2026
- ₹ 986056568.28
- NTID 44431648
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
9861000.00 -
Document Cost
18000.00 -
Estimated Cost
986056568.28
BOQ Items Total Items : 44 | Total Qty : 1274872.54
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation grass bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials (C) By mechanical means in area of light jungle | 23.500 | Hect. |
| 2 | Scarifying gravelled macadam or bitumen macadam surface 6.00 cm to 10.00 cm.depth including stacking useful materials on road side and disposing off remaining stuff. | 225000.000 | Sq.Mt. |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 302.3 | 136260.000 | Cu.Mt. |
| 4 | Box cutting the road surface to proper slope and chamber for making a base for road work including removing the excavated stuff and depositing on the road side slope as directed upto 50m lead. | 73397.000 | Cu.Mt. |
| 5 | Earth work for embankment including breaking clods, dressing with all lead and lift and including watering, rolling and consolidation of subgrade in layers at O.M.C. to required dry density, including filling the depressing, which occurs during the process using power roller of 8 tonne to 10 tonne all as per specification.From Borrow area within all lead & Lift | 39512.000 | Cu.Mt. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054