Inquiry NowConstruction Of Drainage And C in Tirunelveli - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Drainage And C" in Tirunelveli, India.
Directorate of Town Panchayats
Tirunelveli, Tamil Nadu, India
NTID 44365356
- Opening Date : Wed 11th March, 2026
- Closing Date : Wed 11th March, 2026
- ₹ 0.00
- NTID 44365356
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2900.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 8 | Total Qty : 728
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 11.00 | m3 |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 4.00 | m3 |
| 3 | Supplying and erecting centering for sides and soffits of drainage side walls and lane walls with necessary C.W.Scantlings, silver oak planks, casurina poles 10 to 13 and labour charges etc, complete with standard specifications | 64.00 | m2 |
| 4 | Supplying and erecting centering for sides and soffits of drainage side walls and lane walls with necessary C.W.Scantlings, silver oak planks, casurina poles 10 to 13 and labour charges etc, complete with standard specifications | 11.00 | m2 |
| 5 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 11.00 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054