- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Visva Bharati University
- >
NTID 42682897
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Cycle Stands s in Birbhum - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Cycle Stands s" in Birbhum, India.
Visva Bharati University
Birbhum, West Bengal, India
NTID 42682897
- Opening Date : Tue 2nd December, 2025
- Closing Date : Mon 1st December, 2025
- ₹ 3503272.00
- NTID 42682897
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
70065.00 -
Document Cost
500.00 -
Estimated Cost
3503272.00
BOQ Items Total Items : 14 | Total Qty : 4763
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. - Depth of excavation not exceeding 1500 mm | 80.00 | Cu.m |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) - With earth obtained form excavation of foundation | 80.00 | Cu.m |
| 3 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). | 230.00 | Cu.m |
| 4 | Brick work with 1st class bricks in cement mortar (1:6) - In foundation and plinth | 46.00 | Cu.m |
| 5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 1084.00 | Sq.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054