- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Uttar Pradesh Projects Corporation Limited
- >
NTID 45440778
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Cwsn Toilet In in Saharanpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Cwsn Toilet In" in Saharanpur, India.
Uttar Pradesh Projects Corporation Limited
Saharanpur, Uttar Pradesh, India
NTID 45440778
- Opening Date : Mon 15th June, 2026
- Closing Date : Mon 15th June, 2026
- ₹ 350134.00
- NTID 45440778
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 92 | Total Qty : 897.26
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | 8.21 | CUM |
| 2 | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 stone ballast 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. | 1.95 | CUM |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, ramming, dressing etc rate to include cost of all materials, labour and T & P etc required for proper completion of the work. | 1.02 | CUM |
| 4 | Providing and injecting chemical emulsion for preconstructional antitermite treatment Treatment junction of wall and the floor 7.5 liters /sqm (5)Treatment of soil along external perimeter of building 7.5 liters/sqm. (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution) | 6.83 | SQM |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 0.56 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054