- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of SUNDARBAN AFFAIRS DEPARTMENT
- >
NTID 45383145
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Concrete Road in Parganas - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Concrete Road " in Parganas, India.
SUNDARBAN AFFAIRS DEPARTMENT
Parganas, West Bengal, India
NTID 45383145
- Opening Date : Mon 22nd June, 2026
- Closing Date : Thu 18th June, 2026
- ₹ 8824626.00
- NTID 45383145
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
176493.00 -
Document Cost
500.00 -
Estimated Cost
8824626.00
BOQ Items Total Items : 29 | Total Qty : 39994.2
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Laying and Jointing PVC Pipe. Heading | ||
| 2 | Labour for taking out brick-on-edge of herring bone bond including removing debris to flank or berm sorting out serviceable materials and stacking. | 112.00 | % Sqm |
| 3 | Labour for taking out old soling edging including removing debris(a) single brick flat soling. | 112.00 | % Sqm |
| 4 | Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used). (d) Soling or dry pavement with one brick-on-edge laid in herring bone pattern on a layer of brick flat (thickness 75 mm. plus 125 mm) | 67.00 | % Sqm |
| 5 | Labour for laying brick edging (75 mm wide) with departmental brick laid true to line and level including carriage of departmental bricks within a lead of 30 metres cutting necessary trench in soil or in hard metalled surface laying the bricks and repacking the trench (on both sides of the edging) with spoils and ramming the same thoroughly (b) brick on end edging (250 mm. depth) | 102.00 | % Mtr |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054