- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Ministry of Shipping
- >
NTID 44546848
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Compound Wall in Paradip - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Compound Wall " in Paradip, India.
- Opening Date : Mon 13th April, 2026
- Closing Date : Thu 9th April, 2026
- ₹ 12515372.00
- NTID 44546848
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
250307.00 -
Document Cost
3000.00 -
Estimated Cost
12515372.00
BOQ Items Total Items : 28 | Total Qty : 24869.715
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing single under reamed bored compaction pile foundation of 300mm dia & 6.00m length long with reinforced cement concrete of M-20 grade using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream at appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes but excluding GST etc.complete as directed by the Engineer-in-charge . NB:One initial load test and one routine load test ( as per IS 2911 pt-IV) must be conducted. The agency will pay all the expenses.(excluding cost of reinforcement steel and binding wire). | 104.000 | Each No |
| 2 | Cutting pile head up to cut off level including disposing of the dismantled material out of work site, barricating the work site if necessary with supply of all materials, labour, T&P,PPE, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | 104.000 | Each No |
| 3 | Earth work in all kind of soil with initial lead and lift including rough dressing and the excavated earth transported by vehicles with supply of all material, labour, transporation cost , taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge. | 274.095 | Each Cum |
| 4 | Filling in foundation and plinth with excavated all kind of soil including watering and ramming with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed by EIC. as directed by the Engineer-in-charge | 182.800 | Each Cum |
| 5 | Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer not exceeds 0.30m.,watering ,compacting etc all complete including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollage etc all complete but excluding GST. as directed by EIC. (NB- 10% void shall be deducted from measured Qnty) | 34.200 | Each Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054