- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of MUNICIPAL CORPORATION
- >
NTID 42833039
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Community Toil in Tirupathur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Community Toil" in Tirupathur, India.
MUNICIPAL CORPORATION
Tirupathur, Tamil Nadu, India
NTID 42833039
- Opening Date : Wed 26th November, 2025
- Closing Date : Wed 26th November, 2025
- ₹ 2000000.00
- NTID 42833039
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20000.00 -
Document Cost
Refer Documents -
Estimated Cost
2000000.00
BOQ Items Total Items : 83 | Total Qty : 3315
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard speci cation and as directed by the departmental of cers. Footing | 56.00 | Cum |
| 2 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard speci cation and as directed by the departmental of cers. Plinth | 12.00 | Cum |
| 3 | Supplying and filling in foundation and basement with Crushed Stone Sand (M-Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.- M Sand filling | 5.00 | Cum |
| 4 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for ooring including laying,nsolidating, nishing, rendering the top surface rough to receive the oor, curing, etc. complete multiplying with standard speci cation and as directed by the departmental of cers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental of cers | 13.00 | Cum |
| 5 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) - Centering 1 | 20.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054