- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of WATER RESOURCES DEPARTMENT
- >
NTID 44798738
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Chief Minister in Giridh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Chief Minister" in Giridh, India.
- Opening Date : Mon 20th April, 2026
- Closing Date : Sat 18th April, 2026
- ₹ 10740822.00
- NTID 44798738
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
107500.00 -
Document Cost
10000.00 -
Estimated Cost
10740822.00
BOQ Items Total Items : 105 | Total Qty : 15727.074
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supplying labour and equipment for digging well vide classification of soil item-A including removing the spoils to a safe distance upto 50M from the edge of the well all complete as per specification and direction of E/I. (A) E/W upto 3m depth belowG.L.(classification of soil item-A)+(c) Extra for E/W in hard soil item-B) PHED 3.1.64 | 125.050 | M |
| 2 | Supplying labour and equipment for digging well vide classification of soil item-A including removing the spoils to a safe distance upto 50M from the edge of the well all complete as per specification and direction of E/I. 3.1.64 PHED PART B | 125.050 | M |
| 3 | Supplying materials and labour for providing RCCwell curb (1:2:4) icluding centering and shuttering but excluding the cost of reinforecement all complete job as per specification and direction of E/I. PHED 3.1.68 | 12.110 | M |
| 4 | Providing Random rubble stone masonry in CM (1:4) in foundation and plinth with hammer dressed stone less than 0.03m in volume and clean coarse sand of FM 2 to 2.5 including cost of screening,rackingout joints to 20mm depth curing taxes and royalty all complete as per specification and direction of E/I. B.C.D 5.2.28 | 46.240 | M |
| 5 | Supplying and laying boulder in rock toe,heel trenches of the dam as per design and drawing including the cost of materials royalty and all taxes etc. but excluding the cost of carraiges all complete as per specification and direction of E/I. Base Of wall - Part-A P-209, Sl No. 6.4 | 4.460 | M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054