- Home
- >
- Tender
- >
- Punjab Tender
- >
- Department of Airports Authority of India
- >
NTID 44892812
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Ceremonial Lou in Rupnagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Ceremonial Lou" in Rupnagar, India.
- Opening Date : Thu 7th May, 2026
- Closing Date : Wed 6th May, 2026
- ₹ 2650530.00
- NTID 44892812
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
80000.00 -
Document Cost
1180.00 -
Estimated Cost
2650530.00
BOQ Items Total Items : 44 | Total Qty : 845
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SH-I: VRV/ VRF System Supplying, Installation, Testing & Commissioning of Modular type Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units suitable for cooling/heating having 100% hermetically sealed inverter type twin Rotary/Scroll Compressor(s), minimum two compressors (with individual separate PCB) for above 14 HP modules, microprocessor based Controller, top discharge type condensing unit(s), with R-410-A Refrigerant or equivalent, vibration Isolators with suitable foundation etc. complete as required. To have better efficiency condensor fan shall be capable to operate at different speed with respect to load.The unit shall deliver the rated capacity and in confirmation as per IS 18728:2024 and CPWD Specifications and work even at 50 C ambient temperature without tripping. The system shall be able to deliver 100% of the rated capacity upto 39 C. The unit shall be suitable to work on 400V +/- 10%, 3 Phase, 50Hz AC power supply and BMS compatible. The unit shall be filled with first charge of the refrigerant and ready for use as required. The condenser should be coated with a hydrophilic film to prevent water accumulation on the surface of the heat exchanger, enhance water dispersion, and reduce the risk of degradation, thereby improving overall performance and durability. The Indian Seasonal Energy Efficiency Ratio (ISEER) of the unit shall be as per Energy Conservation and Sustainable Building Code (ECSBC) 2024 as below and complete as per CPWD specification, connections, inter connections etc. as required. (For capacity <40 kWr ISEER 7.4, Capacity > 40 and <70 ISEER 7.5, Capacity > 70 ISEER 7.6 for super ECSBC Building) For Cooling or Heating or Both. Outdoor Unit:- 28 HP ( In combination of 02 units with atleast one unit having double compressor) The VRV/VRF unit should be an higher energy-efficient model compliant with BEE regulations. The unit should have free phase technology / Phase loss / Missing phase so that unit can work in case of phase reversal and PCB protection low and high voltage support. compressor operate together as one logical unit, sharing refrigerant load, control signals, Allows continued operation (If one compressor fails continuosly running remaining compressor, like as master and slave configuration). Including all the dip switches and/or control wiring as per OEM recommendation. Refrigerant suction/Liquid line tapping including Pressure testing, vaccummissing of the VRV/VRF system complete as per specifications etc. as required. The outdoor unit shall be installed on open Terrace and shall be provided with mounting base and anti-vibration mounting. | 1.00 | Job |
| 2 | Indoor Unit Supplying, Installation, Testing and Commissioning of following minimum capacity 4 way VRV/ VRF Cassette Type Indoor ceiling mounted unit equipped with synthetic washable media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX Copper coil, electronic expansion valve, outer cabinet, drain pump, grill, necessary supports, vibration Isolation etc., suitable for operation on single phase 230 V 10%, 50Hz AC supply, complete, as required. The Indoor units must shut down upon receiving a singal from the BMS System/Fire Singnals. The system shall be capable to adjust air flow as per room requirement in auto mode. The cooling capacity of indoor unit will be at air inlet conditions of 27 C DB and 19 C WB temperature. (Make will be same as of Outdoor) | ||
| 3 | Indoor Unit:- 1.6 TR | 2.00 | Each |
| 4 | Indoor Unit:- 2.4 TR | 2.00 | Each |
| 5 | Indoor Unit:- 3.6 TR | 2.00 | Each |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054