NTID 42993537
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Cd On Approach in Sindhudurg - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Cd On Approach" in Sindhudurg, India.
MINISTRY OF WATER RESOURCES
Sindhudurg, Maharashtra, India
NTID 42993537
- Opening Date : Tue 9th December, 2025
- Closing Date : Mon 8th December, 2025
- ₹ 1546826.00
- NTID 42993537
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
15500.00 -
Document Cost
2360.00 -
Estimated Cost
1546826.00
BOQ Items Total Items : 18 | Total Qty : 1932.93
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Road work | ||
| 2 | Item No.1: Clearing grass and removal of rubbish up to a distance of 50 metres out side the periphery of the area . | 500.00 | Sqm |
| 3 | Item No.2: Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 127.80 | Cum |
| 4 | Item No.3: Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | 127.80 | Cum |
| 5 | Item No.4 :Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 1.5m To 3.0 m) By Mechanical Means | 92.34 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054