- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Siliguri Jalpaiguri Development Authority
- >
NTID 44469327
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Cc Road In Fro in Jalpaiguri - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Cc Road In Fro" in Jalpaiguri, India.
Siliguri Jalpaiguri Development Authority
Jalpaiguri, West Bengal, India
NTID 44469327
- Opening Date : Thu 2nd April, 2026
- Closing Date : Mon 30th March, 2026
- ₹ 1303220.00
- NTID 44469327
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
26064.00 -
Document Cost
Refer Documents -
Estimated Cost
1303220.00
BOQ Items Total Items : 18 | Total Qty : 2730.17
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth(iii) Without pumping out water but including shoring as required | 178.20 | m3 |
| 2 | Earth in filling in foundation trenches and at the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. including all lifts. Earth to be approved by the Engineer-in-charge. | 178.20 | m3 |
| 3 | Laying 150mm (approximate finished thickness) boulder soling including rough dreesing, breaking necessary hand packing and ramming down small stome pieces in the intersectices including rolling and repairing the bed of proper level camber with necessary cushionine over bed and ultimate filling of voids with moorum or sand or kiln rubbish including cost of all materials but excluding cost of boulders | 176.40 | m2 |
| 4 | (II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety a)1:3:6 proportion | 105.54 | m3 |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.(b) River bazree | 71.25 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054