Inquiry NowConstruction Of Cc Road From D in Kendujhar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Cc Road From D" in Kendujhar, India.
- Opening Date : Fri 5th December, 2025
- Closing Date : Thu 4th December, 2025
- ₹ 45826000.00
- NTID 42791240
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
458300.00 -
Document Cost
11800.00 -
Estimated Cost
45826000.00
BOQ Items Total Items : 32 | Total Qty : 27249.02
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Road Work | ||
| 2 | Clearing and grubbing road land including uprooting rank vegetations grass, bushes, shrubs etc and disposal of unserviceable materials up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per clause no: 201 of MoRT&H and as per direction of EIC. | 5880.00 | Sqm |
| 3 | Excavation,loading,unloding and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specifacation and by the Engineer -in-charge within an initial lead of 1 km from the place of excavation complete. | 5133.61 | Cum |
| 4 | Filling in foundation and plinth or floor with excavated earth or moorum or extra good earth including laying, watering and ramming in 23 Cm (9") thick layers with all necessary leads and lifts complete inclusive of all cost of labour T&P etc. complete as per direction of EIC. | 235.74 | Cum |
| 5 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction & clause 305 of MoRT&H specification for Road & Bridge (5th revision) as per direction of EIC. | 4482.14 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054