- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of NAGAR PALIKA PARISHAD
- >
NTID 32161604
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Builduing in Udhamsign Nagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Builduing" in Udhamsign Nagar, India.
NAGAR PALIKA PARISHAD
Udhamsign Nagar, Uttarakhand, India
NTID 32161604
- Opening Date : Mon 19th June, 2023
- Closing Date : Mon 19th June, 2023
- ₹ 14554000.00
- NTID 32161604
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
292000.00 -
Document Cost
1770.00 -
Estimated Cost
14554000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | datechange | Date |
BOQ Items Total Items : 131 | Total Qty : 35480.99
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Description | ||
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 369.530 | Cum |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m | 258.670 | Cum |
| 4 | SOIL TREATMENT Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: | 764.890 | sqm |
| 5 | SAND FILLING Supplying and filling in plinth with gola sand under floors, including watering, ramming, consolidating and dressing complete. | 36.040 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054