- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of ASANSOL DURGAPUR DEVELOPMENT AUTHORITY
- >
NTID 44421865
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Boundary Wall in Bardhaman - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Boundary Wall " in Bardhaman, India.
ASANSOL DURGAPUR DEVELOPMENT AUTHORITY
Bardhaman, West Bengal, India
NTID 44421865
- Opening Date : Mon 9th March, 2026
- Closing Date : Tue 7th April, 2026
- ₹ 3044384.00
- NTID 44421865
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
60888.00 -
Document Cost
Refer Documents -
Estimated Cost
3044384.00
BOQ Items Total Items : 28 | Total Qty : 12401.8
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling all types of masonary excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. | 1.50 | M3 |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. upto 150 mm. thick | 1.5 | M3 |
| 3 | Labour for taking out (from fencing) line of wire (galvanised, strand or barbed) including the cost of taking out staples (by cutting or otherwise, as necessary). | 1800 | Mtr. |
| 4 | Removal of rubbish , earth etc from the working site and disposal of the same beyond the compound in conformity with the municipal corporation rules for such disposal loading into truck and cleaning the site in all respect as per direction of E.I.C | 3 | M3 |
| 5 | Earth work in excavation of foundation trenches or drains, in all shorts of soil (including mixed soil but excludinglaterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 meter as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1.50 M . | 265 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054