- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of Drinking Water And Sanitation Department
- >
NTID 44484448
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Boundary Wall in Latehar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Boundary Wall " in Latehar, India.
- Opening Date : Wed 25th March, 2026
- Closing Date : Mon 23rd March, 2026
- ₹ 6224655.00
- NTID 44484448
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1250000.00 -
Document Cost
10000.00 -
Estimated Cost
6224655.00
BOQ Items Total Items : 27 | Total Qty : 7955.865
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Laying and Jointing PVC Pipe. Heading | ||
| 2 | Earthwork in excavation in foundation soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, leveling.. ramming the foundation trenches. removing roots of trees, shrubs all complete as per approved design. building specification and direction of E/I. | 252.72 | M3 |
| 3 | Extra for earthwork in hard soil as per specification and direction of E/I(vide classification of soil item-B) | 168.48 | M3 |
| 4 | Earth filling in foundation trenches and plinth in layers not exceeding 150m thick well watered, rammed, fully compacted and fine dressed with earth obtained from 'excavation foundation trenches within a lead of 50m and lift of 1.5m all complete as per building specification and direction of E/I (Mode of measurement complacted volume) | 168.48 | M3 |
| 5 | Providing coarse clean sand in foundation trenches or in plinth including ramming and wateringin layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour. royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement complacted volume). | 16.84 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054