NTID 45368920
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Boundary Wall in Kendujhar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Boundary Wall " in Kendujhar, India.
- Opening Date : Tue 9th June, 2026
- Closing Date : Mon 8th June, 2026
- ₹ 3876735.00
- NTID 45368920
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
38800.00 -
Document Cost
6000.00 -
Estimated Cost
3876735.00
BOQ Items Total Items : 15 | Total Qty : 7087.19
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil such as stoney earth, gravels mixed with stone and boulders not exceeding 0.014cum in volume within 50mtr initial lead and 1.50mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department. | 100.470 | Cum |
| 2 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance , royalty of all materials , labour charges, t&p required for the work etc. All complete & as per the direction of the Engineer-in-Charge. | 21.180 | Cum |
| 3 | C.C.(1:3:6) with 40mm size H.G metal including cost, Conveyance, royalty of all materials with curing, labour charges & T&P etc. All complete as per the direction of the Engineer-in-Charge. | 21.180 | Cum |
| 4 | Reinforced cement concrete M-20 with 20mm size & down graded h.g crusher broken chips for R.C.C works including hoisting & laying including cost, conveyance royalty of all materials t&p required for the work, curing labour charges etc all complete (excluding cost of steel) & as per the direction of the Engineer-in-Charge. | 106.850 | Cum |
| 5 | Rigid & smooth centering & shuttering for R.C.C. works including false works & dismantling them after casting including cost, conveyance, royalty, taxes of all materials, t&p. required for the work etc all complete. (a). Foundation fotting & column base, precast | 268.500 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054