- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of DISTRICT MAGISTRATE UTTAR DINAJPUR
- >
NTID 44290659
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Bituminous Roa in Raiganj - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Bituminous Roa" in Raiganj, India.
DISTRICT MAGISTRATE UTTAR DINAJPUR
Raiganj, West Bengal, India
NTID 44290659
- Opening Date : Wed 18th March, 2026
- Closing Date : Mon 16th March, 2026
- ₹ 0.00
- NTID 44290659
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50448.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 19 | Total Qty : 11220.584
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD. (I) By Mechanical Means a) In area of non-thorny jungle | 0.224 | Hectare |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works) Borrow pit earth | 258.000 | cum |
| 3 | -Do- With carried earth arranged by the contractor within a radius of 5 km. including cost of carried earth. | 77.400 | cum |
| 4 | Supplying and Laying of 300 dia NP-3 spigot Hume Pipe (Single Row) as per direction of the E.I.C. | 5.000 | mtr |
| 5 | B. By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) Grading II | 335.400 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054