Inquiry NowConstruction Of Barbed Wire Fe in Kinnaur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Barbed Wire Fe" in Kinnaur, India.
HIMACHAL PRADESH POWER TRANSMISSION CORPORATION LIMITED
Kinnaur, Himachal Pradesh, India
NTID 46001908
- Opening Date : Thu 6th August, 2026
- Closing Date : Wed 5th August, 2026
- ₹ 0.00
- NTID 46001908
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
8100.00 -
Document Cost
1180.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 8 | Total Qty : 2759
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. (Item code 2.6.1, 2.7.1 & 2.7.3) | 11.68 | Cum |
| 2 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :In cement mortar | 8.2 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 14.88 | Cum |
| 4 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat & Paint of approved brand all complete. | 1189.97 | Kg |
| 5 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 1499.3 | M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.