Inquiry NowConstruction Of Balance R c c in Gautam Budnagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Balance R c c " in Gautam Budnagar, India.
Uttar Pradesh State Industrial Development Corporation Limited
Gautam Budnagar, Uttar Pradesh, India
NTID 45956180
- Opening Date : Fri 24th July, 2026
- Closing Date : Fri 24th July, 2026
- ₹ 19973456.00
- NTID 45956180
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
471374.00 -
Document Cost
5731.00 -
Estimated Cost
19973456.00
BOQ Items Total Items : 11 | Total Qty : 109506.72
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in Foundation including in ordinary soil (Loam clay, or sand) wtering lift upto 1.5meter and lead upto 30m. including filling. the sides and of foundation ramming of excavated earth into the trenches or into disposal trenches or into the plinth and removal and of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches. | 1117.89 | Cum |
| 2 | Concrete with 4cm gauge stone ballast, coarse sand & cement in poroportion of 8:4:1 (8 graded stone aggregate: 4 coarse sand : 1cement :) including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 390.50 | Cum |
| 3 | R.C.C. work with cement, approved coarse sand & 2cm gauge approved stone grit in proportion of 1:1.5:3 in RCC Raft foundation footing and RCC column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 726.86 | Cum |
| 4 | M.S. (tor Steel or plain) in Plain work such as R.C.C. work including beding for proper shape as necessary including bending for proper complition of the work and including supply of all material and wastage, bend hooks, and authorised overlapping shall be measured labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. Work Including cost of binding wire | 57058.51 | Kg |
| 5 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 7100.00 | Rm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054