NTID 44950445
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Approach Pcc R in Latehar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Approach Pcc R" in Latehar, India.
- Opening Date : Wed 29th April, 2026
- Closing Date : Mon 27th April, 2026
- ₹ 1788700.00
- NTID 44950445
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
36000.00 -
Document Cost
5000.00 -
Estimated Cost
1788700.00
BOQ Items Total Items : 19 | Total Qty : 881.815
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 meters outside the periohery of the area as per Technical Specification clause 201 . S.O.R item no. 2.02 | 0.11 | Hac |
| 2 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m S.O.R item no. 3.06 | 199.49 | M3 |
| 3 | (Loosening of the ground a level of 500 mm below the sub-grade level , watered, graded and compacted in layers to meet requirement of Table 300-2 for subgrade construction) S.O.R item no. 3.20 Case- I | 132.875 | M3 |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. S.O.R Item no. 3.18 (II) | 51.36 | M3 |
| 5 | Construction of Granular Sub- base ( for grading -I Material) by providing close graded material, spreading in uniform layers with motor graded on prepared surface , mixing in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density . complete as per Technical Specicification . S.O.R 4.01 B (I) | 132.75 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054