- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Directorate of Local Bodies UP
- >
NTID 44436194
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of An Rcc Drain F in Deoria - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of An Rcc Drain F" in Deoria, India.
Directorate of Local Bodies UP
Deoria, Uttar Pradesh, India
NTID 44436194
- Opening Date : Tue 31st March, 2026
- Closing Date : Tue 31st March, 2026
- ₹ 0.00
- NTID 44436194
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
483571.00 -
Document Cost
4836.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 7 | Total Qty : 936.36
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation of foundation in ordinary soil (loam, clay & sand) including liftupto 1.50 m and lead upto 30 cm including filling, watering and raming of excavated earth into the trenches or in the plinth and removal and disposal of surplus earth as directed by the Eng. including upto a distance of 30 mtr from foundation as per (S.l.No.251) | 523.130 | cum |
| 2 | Cement concrete with 4 cm (1/1.5") gauge approved stone , ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. (S.l.No-281) | 70.000 | cum |
| 3 | M-20 class R.C.C work with cement approved coarse sand 20mm gauge stone grit in proportion of 1:1.5:3 in foundation and footing excluding the supply of rainforcement and its bending but including its bidding the same with 24 BWG HI binding wire and alos including providing & fixing necessary centering and shuttering and its removal after completion of work & supply of all other materials labour T&P etc. Required for the proper completion of the work. As per (S.l.No.284A) | 156.250 | cum |
| 4 | Mild steel of iron work in plain work such as in reinforced concreate or reinforced brick work (When not included in overall rate) wrought to required shapes as necessary and bending for the proper completion of work including supply of steel and its wastages and all labour and T&P required for proper completion of work note the steel shall bent cold and all bends hooks and authorised over lapping shall be measured as per s.l. No 504 | 183.980 | Qtl |
| 5 | Bioremediation work as per estimate | 1.000 | job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054