Inquiry NowConstruction Of Additional Sum in Paradip - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Additional Sum" in Paradip, India.
- Opening Date : Tue 27th January, 2026
- Closing Date : Fri 23rd January, 2026
- ₹ 8701070.00
- NTID 43415627
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
174021.00 -
Document Cost
5000.00 -
Estimated Cost
8701070.00
BOQ Items Total Items : 121 | Total Qty : 10401.65
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in all kinds of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the earth transported by transport vehicles disposing at places as directed with supply of all labour, materials, T&P, taxes, as directed by the Engineer-in-charge. (Excluding cost of GST) | 696.00 | Each Cum |
| 2 | Shoring and shuttering for foundation trenches, pits etc. with supply of 38 mm thick non sal planks for poling boards and 10 mm thick non sal planks for walling and 125 mm dia non sal bullah for strutting including putting close the wooden planks sheets for protection of excaveted earth pit with supply of all labour, materials, T&P, taxes, tollage, royalties, transportations etc. all complete as directed by Engineer-in-charge.(Excluding cost of GST) | ||
| 3 | Sump foundation from 1.50m to 3.00m depth | 215.00 | Each Sqm |
| 4 | Pump room foundation upto 1.50m depth | 132.00 | Each Sqm |
| 5 | Filling in foundation and plinth with filling sand(dredged spoil) including watering, and ramming with supply of all labour, materials, water charges, T&P, taxes,transportations loading & unloading etc. all complete as directed by Engineer-in-charge.(Excluding cost of GST) (NB : 10% voids to be deducted from actual measured qty. at site). | 139.00 | Each Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054