- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Public Works Department
- >
NTID 42731659
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of A New Open Sta in Murshidabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of A New Open Sta" in Murshidabad, India.
Public Works Department
Murshidabad, West Bengal, India
NTID 42731659
- Opening Date : Fri 5th December, 2025
- Closing Date : Wed 3rd December, 2025
- ₹ 2498877.00
- NTID 42731659
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
49978.00 -
Document Cost
Refer Documents -
Estimated Cost
2498877.00
BOQ Items Total Items : 119 | Total Qty : 4574935.103
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | 400.000 | Sq.M. |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | 87.180 | %Cu.M. |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis ofmeasurement of finished quantity of work) With earth obtained from excavation of foundation. | 69.740 | %Cu.M. |
| 4 | With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth. | 16.556 | %Cu.M. |
| 5 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 47.461 | %Cu.M. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054