- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Saharanpur Municipal Corporation Saharanpur UP
- >
NTID 45418143
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of A Drainage Sys in Saharanpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of A Drainage Sys" in Saharanpur, India.
Saharanpur Municipal Corporation Saharanpur UP
Saharanpur, Uttar Pradesh, India
NTID 45418143
- Opening Date : Tue 23rd June, 2026
- Closing Date : Mon 22nd June, 2026
- ₹ 1881450.00
- NTID 45418143
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
188145.00 -
Document Cost
1298.00 -
Estimated Cost
1881450.00
BOQ Items Total Items : 12 | Total Qty : 2108.38
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in filling with cartage 8.0 km from site i/c all comp of work. | 661.11 | m3 |
| 2 | (a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move) | 42.00 | m3 |
| 3 | Disposal of waste malba from site upto 5.0 km i/c all comp of work | 29.00 | m3 |
| 4 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour, T&P etc. required for proper completion the work | 24.96 | m3 |
| 5 | Construction of Granular sub- base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in lace method with rotavator of OMC, and compacting with vibratory power roller to achive the desired | 126.27 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054