- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of CIAL Infrastructures Limited
- >
NTID 44509820
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of A Deep Water R in Ernakulam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of A Deep Water R" in Ernakulam, India.
- Opening Date : Fri 24th April, 2026
- Closing Date : Thu 23rd April, 2026
- ₹ 34700000.00
- NTID 44509820
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
700000.00 -
Document Cost
1180.00 -
Estimated Cost
34700000.00
BOQ Items Total Items : 221 | Total Qty : 123916
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SH : EARTHWORK | ||
| 2 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1455 | sqm |
| 3 | Earth work in excavation by means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, dewatering, lift upto 1.5m and all leads; disposal of earth outside the periphery of the area, disposed earth to be levelled and neatly dressed as directed by the Engineer-in-Charge-All kinds of soil. | 276 | cum |
| 4 | Providing and applying Antitermite treatment by injecting chemical emulsion Imidacloprid emulsiable concentrate 0.075 percentage for pre-constructional treatment and creating a chemical barrier as per IS 6313 (Part II) 2001 for wall trenches, foundation, top surface of plinth filling, foundation of wall and floor, along the external perimeter of the building, etc. complete conforming to manufacturers specification and as directed by the Engineer-in-Charge. (Plinth area only to be measured for the payment ) | 254 | sqm |
| 5 | Filling in plinth or trenches, under floors, foundations, in areas etc with contractors own red earth including watering, ramming consolidating and dressing, cost and conveyance of all materials,labour charges,lead,lift etc complete at all levels as directed by the Engineer-in-Charge | 25 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054