Inquiry NowConstruction Of 3 X 3 Mt Span in Unnao - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 3 X 3 Mt Span" in Unnao, India.
Public Works Department
Unnao, Uttar Pradesh, India
NTID 42990767
- Opening Date : Fri 5th December, 2025
- Closing Date : Fri 5th December, 2025
- ₹ 3250000.00
- NTID 42990767
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
325000.00 -
Document Cost
857.00 -
Estimated Cost
3250000.00
BOQ Items Total Items : 17 | Total Qty : 1559.1
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works..(Including labour Cess & Excluding GST) | 37.50 | Rmt |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(Including labour Cess & Excluding GST) | 133.00 | Cum |
| 3 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.as per drawing and technical speficiations Clauses 802,803,1202 & 1203 (Including labour Cess & Excluding GST) | 16.00 | Cum |
| 4 | Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 (Including labour Cess & Excluding GST) | 57.00 | Cum |
| 5 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 (Including labour Cess & Excluding GST) | 9.80 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054