- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Tamil Nadu Urban Habitat Development Board
- >
NTID 43693473
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 719 Tenements in Kanchipuram - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 719 Tenements " in Kanchipuram, India.
Tamil Nadu Urban Habitat Development Board
Kanchipuram, Tamil Nadu, India
NTID 43693473
- Opening Date : Thu 19th February, 2026
- Closing Date : Thu 19th February, 2026
- ₹ 0.00
- NTID 43693473
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
11400000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 257 | Total Qty : 911474.24
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the Engineer with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the Engineer.- Upto required Footing Depth. Data worked out for 48 m3 per day/8 hrs. | ||
| 2 | With intial lead of 10 m and Intial lift of 2.40 m | 10705.03 | M3 |
| 3 | With intial lead of 10 m and additional lift of 2.40-3.40 m | 652.90 | M3 |
| 4 | Supplying and filling in foundation, basement, etc with Quarry Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the Engineer. | 1201.34 | M3 |
| 5 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the Engineer in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the Engineer. | 1859.04 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054