- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of BACKWARD CLASSES WELFARE DEPARTMENT
- >
NTID 43861937
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 120 Seated St in Mayurbhanj - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 120 Seated St " in Mayurbhanj, India.
BACKWARD CLASSES WELFARE DEPARTMENT
Mayurbhanj, Odisha, India
NTID 43861937
- Opening Date : Sat 21st February, 2026
- Closing Date : Fri 20th February, 2026
- ₹ 30418800.00
- NTID 43861937
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
304200.00 -
Document Cost
10000.00 -
Estimated Cost
30418800.00
BOQ Items Total Items : 258 | Total Qty : 28570.836
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the dept. | 235.730 | Cum |
| 2 | extra for every additional lift of 1.5 m or part there of in excavation/ banking excavated or stacked materials | 78.730 | Cum |
| 3 | Supplying & Filling foundation trenches , plinth & ditches with clean course river sand well watered and rammed in layers not exceeding 23 c.m. in depth with all lead and lift including cost, conveyance, loading, unloading, stacking,royalties and all taxes of sand,cost & conveyance of water, cost of all Labour,labour cess,T&P required for the work etc. complete in all respect as directed by the Engineer- in -charge. | 455.670 | Cum |
| 4 | Back filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m. | 77.790 | Cum |
| 5 | Making plinth protection 150 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth | 105.930 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054