Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 3 Nos Bt Road " in Khorda, India.
- Opening Date : Wed 21st October, 2026
- Closing Date : Wed 21st October, 2026
- ₹ 42385009.00
- NTID 47015959
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
423850.00 -
Document Cost
11800.00 -
Estimated Cost
42385009.00
BOQ Items Total Items : 13 | Total Qty : 86591.3
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | ROAD WORK | ||
| 2 | Cleaning & grubbing road land including uprooting rank vegetation ,grass bushes ,shrubs,saplings & trees girth up to 300mm ,removal of stumps of trees cut earlier & disposal of unserviceable material & &stacking of serviceable material to be used or auctioned ,up to a lead of 1000meters including removal & disposal of top organic soil not exceeding 150mm in thickness | 12540 | Sqm |
| 3 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction construction & Clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision) | 2967.8 | Sqm |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision) Unit = cum Taking output = 100 cum.(Using Fly Ash as sub grade material collected from IMFA Thermal Power Plant Chaudwar Cuttack. ) | 37137.08 | cum |
| 5 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision) Unit = cum Taking output = 100 cum Using Natural soil as embankment material | 1203.8 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054