Inquiry NowConstruction Of 1 Nos 120 Men in Dalmau - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 1 Nos 120 Men" in Dalmau, India.
Indo Tibetan Border Police Force
Dalmau, Uttar Pradesh, India
NTID 44342206
- Opening Date : Mon 30th March, 2026
- Closing Date : Fri 27th March, 2026
- ₹ 74801688.00
- NTID 44342206
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1496034.00 -
Document Cost
Refer Documents -
Estimated Cost
74801688.00
BOQ Items Total Items : 222 | Total Qty : 298048.61
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Pre-construction activity includes soil investigations, Foundation & Structure Design, preparation of detailed shop and builtup drawings as per site requirement, through associated consultant and proof checking of structural design of all components as per the terms and condition of NIT all complete & as per the direction of Engineer-In-Charge. (Payment will be made after completion of full job) | 1.00 | Job |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1338.56 | Cum |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 127.18 | Cum |
| 4 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil.Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 325.00 | Meter |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 976.96 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054