- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of Uttarakhand Pey Jal Nigam
- >
NTID 42732686
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 1500 Kl Oht 0 in Haridwar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 1500 Kl Oht 0" in Haridwar, India.
Uttarakhand Pey Jal Nigam
Haridwar, Uttarakhand, India
NTID 42732686
- Opening Date : Tue 2nd December, 2025
- Closing Date : Thu 27th November, 2025
- ₹ 36512699.00
- NTID 42732686
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
730000.00 -
Document Cost
5900.00 -
Estimated Cost
36512699.00
BOQ Items Total Items : 79 | Total Qty : 6145.62
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | P/L Double Chambered Ductile Iron Pipes Restrained Joint of class K-9 with true to alignment & Jointing of full lenght including supply of packing confirming to IS: 5382-1985 with testing of pipe line complete. | ||
| 2 | 250 mm | 300.00 | Mtr |
| 3 | Excavation of earth for pipe line in soil mixed with shingle ,bajri, and boulder strata lift up to 1.5 m. lead up to 30m. Including reffiling, watering, remaining lf excavated earth into the trenches and removal of surplus earth up to a distance of 60m from trenches including supply of labour T&P etc. all complete. | 348.00 | cum |
| 4 | Supply of all materials, T&P etc.and construct an RCC over head tank of following size with RCC staircase & 1 m wide balcony, G.I. pipes railing consisting of 3 rows of 20 mm dia. G.I. pipe and angle iron posts around balcony & at the dome periphery, M.S. ladder from balcony to top of tank and inside the tank, supply and fixing M.H. cover with locking device, 1.2m dia ventilator, lightening conductor, water level indicator, supply and fixing of pipes, CI D/F pines, supply and fixing M.S. clamps with RCC column 40mm PCC 1:2:4 over 80 mm PCC 1:4:8 in apron, 150 mm semicircular drain around the tank, escape channel of 20 m length, box type enclosure at the entrance of the staircase having locking arrangements, two coats of apex paint and testing of tank for water tightness and also including cost of supply and fixing of all necessary pipes and valves etc. all complete with inlet, outlet, overflow and washout pipes with bypass arrangement and necessary fittings and specials and testing of bearing capacity. | ||
| 5 | (1500 KL.)18 m staging | 1500.00 | KL |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054