- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of HIGHER EDUCATION
- >
NTID 42756191
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 10 Class Rooms in Salem - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 10 Class Rooms" in Salem, India.
HIGHER EDUCATION
Salem, Tamil Nadu, India
NTID 42756191
- Opening Date : Wed 3rd December, 2025
- Closing Date : Tue 2nd December, 2025
- ₹ 36880000.00
- NTID 42756191
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
194500.00 -
Document Cost
Refer Documents -
Estimated Cost
36880000.00
BOQ Items Total Items : 135 | Total Qty : 37256.23
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard speci cation and as directed by the departmental of cers. | 1246.000 | cum |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- 2.40m-3.30M Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 246.000 | cum |
| 3 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. A). Upto 2.40m Depth. Data worked out for 64 m3 per day/8 hrs | 85.000 | cum |
| 4 | Providing and laying, spreading and compacting graded stone aggregates to wet mix macadam 300mm thick specification including premixing the materials with water at OMC in mechnical mix plant carriage of mixed materials by tipper to site laying in uniform layers with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. | 272.500 | cum |
| 5 | Supplying and Filling in foundation and basement and trenches with M-Sand in layers of not more than 15cm thick well rammed watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 84.000 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054