- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of Ministry Of Human Resources Department
- >
NTID 42760718
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 100 Bedded Hos in Garhwa - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 100 Bedded Hos" in Garhwa, India.
- Opening Date : Mon 1st December, 2025
- Closing Date : Fri 28th November, 2025
- ₹ 27143820.00
- NTID 42760718
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
272000.00 -
Document Cost
10000.00 -
Estimated Cost
27143820.00
BOQ Items Total Items : 155 | Total Qty : 47128.54
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Construction of 100 Beded Hostel for PVTG AT Rajkiyakrit +2 Sri Sad Guru Pratap Hari High School Chainpur, at Chainpur Block in Palamu District of Palamu Division in Jharkhand | ||
| 2 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 857.03 | M3 |
| 3 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) | 276.24 | M3 |
| 4 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 580.79 | M3 |
| 5 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 1150.31 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054