- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of Ministry Of Human Resources Department
- >
NTID 42794471
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 08 A c r At Up in Pakur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 08 A c r At Up" in Pakur, India.
- Opening Date : Mon 1st December, 2025
- Closing Date : Fri 28th November, 2025
- ₹ 6681500.00
- NTID 42794471
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
135000.00 -
Document Cost
10000.00 -
Estimated Cost
6681500.00
BOQ Items Total Items : 65 | Total Qty : 11609.44
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Construction of 8 ACR at Upgraded High School Dangapara Block Hiranpur District Pakur | ||
| 2 | Earth work in excavation in foundation trenches in ordinary soil(vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 144.075 | M3 |
| 3 | Extra for earthwork in hard soil as per specification and direction of E/I. | 144.075 | M3 |
| 4 | Providing Earth filling in Foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I. | 108.056 | M3 |
| 5 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 96.536 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054