- Home
- >
- Tender
- >
- Arunachal Pradesh Tender
- >
- Department of Indo Tibetan Border Police Force
- >
NTID 44091510
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Clothing Ration in Lower Dibang valley - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Clothing Ration " in Lower Dibang valley, India.
Indo Tibetan Border Police Force
Lower Dibang valley, Arunachal Pradesh, India
NTID 44091510
- Opening Date : Wed 11th March, 2026
- Closing Date : Tue 10th March, 2026
- ₹ 84071220.00
- NTID 44091510
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1681424.00 -
Document Cost
Refer Documents -
Estimated Cost
84071220.00
BOQ Items Total Items : 82 | Total Qty : 90443.22
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation over areas (exceeding 30 cm in depth 1.5 m in width as well as 10 Sqm in plan) including disposal of excavated earth, lead up to 50 m, disposed earth to be levelled and neatly dressed: All kinds of soil | 692.97 | Cum |
| 2 | Earth work in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Orinary rock | 692.61 | Cum |
| 3 | Filling available excavated earth ( excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completelead up to 50 m and lift up to 1.5 m, | 281.69 | Cum |
| 4 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1890.00 | Sqm |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 386.44 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054