Tender for MUNICIPAL AFFAIRS DEPARTMENT - NTID 30712265
MUNICIPAL AFFAIRS DEPARTMENT
Hooghly, West Bengal, India
NTID 30712265
- Opening Date : Mon 13th February, 2023
- Closing Date : Sat 11th February, 2023
- ₹ 359224.00
- NTID 30712265
Construction Beautification Including Gic Sheet Shead Roofing Hand Railing Including Fixing By Concreting R C C Works Painting On Steel Surface Of Mazar E Sarif And Decorative Pathway At Historical Abanindra Nath Tagore S Bagan Bari
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
7184.00 -
Document Cost
Refer Documents -
Estimated Cost
359224.00
BOQ Items Total Items : 12 | Total Qty : 58165.44204536
# | Item | Quantity | Units |
---|---|---|---|
1 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor | 51.7800 | sqm |
2 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL | 0.1687 | MT |
3 | Polythene sheet | 51.78 | sqm |
4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes | 3.37 | Cum |
5 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) Page No-1, Item No- 3(a) | 0.3375 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane