- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of MUNICIPAL CORPORATION
- >
NTID 45969597
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction And Renovation Of in Perundurai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction And Renovation Of" in Perundurai, India.
MUNICIPAL CORPORATION
Perundurai, Tamil Nadu, India
NTID 45969597
- Opening Date : Fri 7th August, 2026
- Closing Date : Fri 7th August, 2026
- ₹ 42400000.00
- NTID 45969597
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
424000.00 -
Document Cost
Refer Documents -
Estimated Cost
42400000.00
BOQ Items Total Items : 100 | Total Qty : 20168
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard speci cation and as directed by the departmental of cers.- Upto 2.40m Footing Depth. FOOTING | 312.00 | M3 |
| 2 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental of cers and clearing and levelling the site, etc., complete complying with standard speci cation and as direct-ed by the departmental of cers. | 31.00 | M3 |
| 3 | Supplying and lling in foundation, basement, etc with lling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard speci cation and as directed by the departmental of cers. | 26.00 | M3 |
| 4 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard speci cation and as directed by the departmental of cers -Mixing by mechanical means | 70.00 | M3 |
| 5 | Supply and lling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard speci cation and as directed by the departmental of cers. | 368.00 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054