- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of BHABHA ATOMIC RESEARCH CENTRE
- >
NTID 43856849
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction And Re-surfacing in Mumbai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction And Re-surfacing " in Mumbai, India.
BHABHA ATOMIC RESEARCH CENTRE
Mumbai, Maharashtra, India
NTID 43856849
- Opening Date : Wed 11th March, 2026
- Closing Date : Fri 6th March, 2026
- ₹ 35497000.00
- NTID 43856849
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
837730.00 -
Document Cost
Refer Documents -
Estimated Cost
35497000.00
BOQ Items Total Items : 33 | Total Qty : 71391
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling Bituminous road including stacking of serviceable materials and disposal of unserviceable materials within 200 m lead. | ||
| 2 | Bituminous Road | 25 | CuM |
| 3 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge (a) From 0.00 to 1.50 m depth from Average Ground Level. | 100 | CuM |
| 4 | FORMING EMBANKMENTS for all height above ground level with selected approved soil, in layers not exceeding 150 mm thick including breaking clods, watering, rolling each layer with power roller of minimum 8 tonnes capacity & rolling every 3rd & top most layer with power roller of minimum 8 tonnes capacity to attain atleast 90% of the proctor density, dressing the sides & top to the required profile & grade etc. complete. | ||
| 5 | with earth available from excavations within a lead of 5 km. by mechanical Transport inside BARC . | 100 | CuM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054