Inquiry NowConstriction Of Retaining Wall in Kendujhar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Constriction Of Retaining Wall" in Kendujhar, India.
- Opening Date : Mon 27th April, 2026
- Closing Date : Fri 24th April, 2026
- ₹ 2747000.00
- NTID 44836653
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
27500.00 -
Document Cost
7080.00 -
Estimated Cost
2747000.00
BOQ Items Total Items : 12 | Total Qty : 1292.29
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Civil Works | ||
| 2 | Excavation,loading,unloding and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc inter spread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specifacation and by the Engineer -in-charge within an initial lead of 1 km from the place of excavation complete | 128.72 | Cum |
| 3 | Excavation, loading and carriage by mechanical means in D.I. rock, laterite and soft rock not requiring blasting interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete | 49.82 | Cum |
| 4 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders (except sheet rocks and boulders requiring for blasting) including dressing and leveling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC. | 6.48 | Cum |
| 5 | C.C of prop. (1:3:6) in foundation using 25mm. Size B.H.C.B chips of approved quality from approved quarry including lowering,laying concrete to required levels laid in layers not exceeding 150mm thick including cost and conveyance of materials, payment of royalties,DMF, EMF & additional charges, cost of all labour, tools & plants (T&P), handling, loading & unloading , other incidental charges required to complete the work in all respects as per the direction of the Engineer-in-Charge. | 6.20 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054