- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of ELECTRONICS TECHNOLOGY PARKS
- >
NTID 40437822
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Comprehensive An in Trivandrum - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Comprehensive An" in Trivandrum, India.
ELECTRONICS TECHNOLOGY PARKS
Trivandrum, Kerala, India
NTID 40437822
- Opening Date : Sat 5th July, 2025
- Closing Date : Fri 4th July, 2025
- ₹ 44500000.00
- NTID 40437822
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
100000.00 -
Document Cost
8850.00 -
Estimated Cost
44500000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date extension1 | Date |
| 2 | Date extension2 | Date |
| 3 | Extension 2 | Date |
BOQ Items Total Items : 490 | Total Qty : 68388.681
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SEZ Area Building Maintenance works (Includes SEZ notified areas in Phase III and Kollam Campuses, The rates shall be quoted considering the necessary tax exemption applicable for SEZ Kerala) | ||
| 2 | Earth work in excavation by manual means in foundation trenches or drains, sunken area, including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil in side the building and disposal of surplus excavated soil as directed, outside technopark campus. All kinds of soil The rate inclusive of all material charge, labour, transportation, loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 20.000 | Cum |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and sunken area etc. in layers not exceeding 20 cm in depth, in building, consolidating each deposited layer by ramming and watering, lead up to 500 m and lift up to 1.5 m. All kinds of soil. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 25.000 | Cum |
| 4 | Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations and sunken area etc. in layers not exceeding 20 cm in depth, in building consolidating each deposited layer by ramming and watering, lead up to 250 m and lift up to 1.5 m as per direction of site Engineer-in-charge The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 15.000 | Cum |
| 5 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand) in building. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 20.000 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054