- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Municipal Bodies
- >
NTID 43791238
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCommunity Centre At Gobinda Mu in Keonjhar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Community Centre At Gobinda Mu" in Keonjhar, India.
- Opening Date : Wed 11th February, 2026
- Closing Date : Tue 10th February, 2026
- ₹ 1351581.00
- NTID 43791238
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
13516.00 -
Document Cost
7080.00 -
Estimated Cost
1351581.00
BOQ Items Total Items : 51 | Total Qty : 1796.47
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . | 34.98 | cum |
| 2 | Carriage of Excavated earth by mechanical means with in 5km lead including loading and unloading with all cost Conveyance T&P sun dries etc.complete as per direction of Enggineer-in-charge. | 27.98 | cum |
| 3 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 40.79 | cum |
| 4 | C.C. ( 1 : 4 : 8 ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 6.80 | cum |
| 5 | P.C.C. work in M-20 Grade of concrete using 20 mm & down graded size hg chips including hoisting & laying the concrete, watering and curing etc. including cost of centering and shuttering for the work etc. all complete to required levels laid in layers including cost, conveyance to site , royalty , cess DMF & EMF and additinol royalty etc. all taxes of all materials & cost of all labour complete | 1.54 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054